NVCC Manassas Battleview
Site upgrades included stormwater improvements with pipe, structures, trench drains and a landscaped bioretention area, new asphalt parking lot with signage and marking, concrete sidewalks, concrete pedestrian bridge with electric ice melt system, concrete steps, hand railings and concrete islands with landscaping. All work was efficiently and safely performed while students and faculty were in school session using the building.